The following parameters must always be measured: water flow rate, hot water temperature, cold water temperature, wet bulb temperature, fan power (mechanical draft towers), dry bulb temperature (natural draft towers), and wind speed. In addition, any other factor affecting the towers operation or the data taken must be accounted for. Examples may include pump discharge pressure, make-up flow and temperature, blow-down flow and temperature, auxiliary streams entering the collection basin, etc. The
first order of business to conduct a test is to inspect
the tower to ensure it is ready for the test and identify points of
measurement for the various parameters. While the 3rd party test agencies may
consider the tower condition, it is really not
their obligation to clean, balance, or otherwise adjust the tower. The customer
is expected to maintain the condition of the tower and
prepare it for the test. In the case of an acceptance test, the
manufacturer will normally be much more thorough in this area to ensure the
tower's full potential is measured. Once this is complete and all parties are
satisfied, instruments are deployed and the testing begins. This process can
take from a couple of hours to one or more days usually depending on the size of
the tower.
|
|
|